loading

Rolling processing waste safety operation procedures

by:Waxing     2020-10-02
1. Operators must confirm there is no movement across the red steel, can operate. 2. Working point and the surrounding can not have any equipment operation. 3. Processing first rescue tubing, conduit, trachea, cutting edge, etc. , to prevent the high temperature combustion or cracking. 4. When using flame cutting, must show certificates by designated persons. Operating personnel must strictly abide by the 'gas welding ( Gas cutting) Work safety operation regulation. 5. Need some equipment, must operation by one man, one command, not many people command. Controllers are not allowed to contact mechanical rotating parts of the body. When handling scrap and may not be directly with day coupler lifting sling waste rolled piece, prevent fall and light steel wire rope. 6. Use the crown must be in accordance with the provisions, signals and gestures. And adhere to the principle of 'ten don't hanging'. 7. When processing scrap in shear zone, it is necessary to confirm the scissors have power cut, otherwise can not close. 8. A punching waste, scrap must buckle with steel wire or steel chain bundle tight before lifting. Hot steel scrap are not allowed to use wire clasp lifting. 9. Eliminate bench drawing steel, stay away from rejecting bench.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Thanks for your message, we will reply you soon in our working time!