loading

Reclaimer's tally 'trilogy'

by:Waxing     2020-11-13
Reclaimer's tally 'trilogy' of 2020 - 12 - 23 ( The house of han steel worker) 1 #, 2 # sintering plant running workshop dou turbine is one of the most important equipment in sintering plant. Rollover unloading, picking a levite is important production tools, mainly for the material stack, take a yard. Move after the plant overhaul, running workshop active thinking, formulate corresponding measures, and set up a triple check team, to boost reclaimer's smooth running. Post to check, strengthen the daily maintenance. Clear four class reclaimer's post personnel, and organize the training, improving the capacity of jobs in the tally. Main point check main equipment and auxiliary equipment, including the reclaimer's tally once per class, the tally of parts including transmission parts, bearing temperature, motor temperature, lubricating oil, the surface of the fixed part of the body structure and electrical parts, etc. Check method, relying on 'see, hear, smell and touch feeling to check equipment such as vibration, wear and tear, sound, temperature, pressure, connection parts with and without relaxation, shell crack corrosion, run, run, drip, leak phenomenon. Check found that the problem of processing method, and the implementation of equipment maintenance of eight policy: adjustment, fastening, cleaning, refueling, to can't handle problems timely communication workshop. Maintenance check, strengthen the maintenance on a regular basis. Improve the level of maintenance personnel skills and professional quality, put an end to check through the motions, the phenomenon such as leak and mistakenly identified. Asked dou turbine machine maintenance personnel comprehensive check once a day, found that the problem handled in time, to deal with timely feedback of the workshop. Chartered maintenance personnel must be of the reclaimer's operation procedures, maintenance procedures, operation situation and situation of lubrication and maintenance, maintenance, fault condition and so on must accomplish know fairly well, like the palm of his hand. Reclaimer's abnormal condition, in a timely manner to the workshop leader and the tally member have reflect, communication and solve. Professional tally, strengthening equipment management. Run the workshop for the reclaimer's specialized training for a professional equipment management personnel, with professional knowledge to solve the question, at the same time, supervise post work on the implementation of check and maintenance personnel. And don't regularly check in-depth field, according to the check records of specific spot check to verify tally, and for the tally is not in conformity with the requirements of the inspection report, then unified with rectification. ( Sintering plant was closed)
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Thanks for your message, we will reply you soon in our working time!