KALMAR positive damping rubber sets of replacement process share after hanging
by:Waxing2020-11-16
KALMAR positive after hanging damping glue set share 2020 - changing process
01 -
09 Yang Jian (
Dalian set port technology service co. , LTD. )
To bridge the pendulum suspension supporting, the use of maintenance-free rubber components (
Suspension rubber)
To maintain the stability of the locomotive running.
The terminals and the terminal customer KALMAR positive damping rubber after hanging there are two different wear and tear, in order to standardize operations, query related technical manuals, without this aspect the decomposition process, will now be in the near future after damping rubber sets of replacement process to share with everyone.
Here is on May 17, 2019, yi all KALMAR positive after hanging damping rubber sets of replacement process, the specific process is as follows.
1, in order to ensure work safety, smooth, first of all to remove the bridge on both sides of the tyre,
Jack, adhesion, standing in the counterweight mat well prepared deflated remove tire)
To ensure enough maintenance space and ensure the security of the follow-up work.
2, remove the steering cylinder tubing, connectors, tilting prevention sensors.
Using large enough jack (
80吨)
Top position in below jack (
Load in order to reduce the jack-up position, in advance before the downtime for the large arm forward part)
, after jacking in rear axle and rear frame increase limit block, prevent jack a surprise drop in.
Later, gradually remove the pedal-driven vehicles axis, stop bolt, stop pin and block.
3, remove rubber damping blocks, continue to jack lifting jacks, until enough height, can use the following link block to take out from the installation, should pay attention to the connection piece of weight.
After removed, remove the suspension rubber cover, cylinder liner block and bolt, decomposition.
4, remove the pedal-driven vehicles shaft collar on both sides.
5, on the other hand, the installation.
Hope, the share of KALMAR helps everyone positive damping rubber sleeve parts after hanging structure and work timely help.