loading

Static pressure grinding head installation procedure

by:Waxing     2020-09-20
Of dynamic and static pressure grinding head installation procedure summary: unpacking check whether there is any damage on components observed during transport on machine tools note jacket refueling process not impact of machine tool spindle pump station with spindle half liter standard gas must be three layers of silk filtering note must spindle cannot replace the pump motor access machine tools main switch always switch station motor work inspection station to whether liquid static pressure bearing shaft shell with shaft < 1> unpacking check all parts and components, observe any damage in transit. < 2> the grinding head mount machine, pay attention to in the machine tool in the process of the jacket, not impact of machine tool spindle. < 3> add 2 # main shaft oil from refueling station about 80 litres of half the oil mark, during fuel filter must be three layers of silk cloth. Note: be sure to 2 # spindle oil, can not use other instead. < 4> the pump motor is connected to the machine tool main switch, the machine tool main switch a pump motor will work. Check whether pump motor turning clockwise. The high pressure suction hose inserted inside filler, pump station work 15 ~ 20 minutes, since oil circulation, ensure the pump station oil clean.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Thanks for your message, we will reply you soon in our working time!