loading

Waste transfer pump bearing maintenance way - bearing knowledge

by:Waxing     2020-06-04
Of the pump bearing maintenance method and the dismantling of pay attention to the problem: 1, put into use new waste transfer pump, general in 100 hours after operation to replace the grease ( Oil) 1, 500 hours after each run. 2, floating bearing is lubricated by grease, run after 1500 hours, should be replaced, grease filling the oil amount is too little or too much, because too much or too little will cause bearing grease fever, amount to general in the bearing should be 1/2 to 2/3 of the chamber volume. 3, for bearing is lubricated by lubricating oil, the oil should be added to the specified location. 4, containers of lubricating oil or grease to clean, should be sealed at ordinary times, should not have dust, iron and other sundry, in order to avoid damage to the bearings. 5, motor bearings commonly used sodium base grease, this kind of ability is the feature of high temperature grease ( 125℃) , but easy to dissolve in the water, so can't use it for the pump bearing lubrication. Eddy machine is CAM pump manufacturers, the company products have CAM rotor pump, piston pump rotor, the rotor pump, CAM pump, mud pump, sewage pump, mud pump, pump truck, a slurry pump, the pump of excrement and urine, septic tank sewage pump, cow dung pumping pump, oily sewage pump, pump sweep storehouse, oil-gas mixture pumps, oil pump, sewage pump, rail vacuum discharge sewage equipment, pressure filter feed pump, eat hutch garbage pump, elastic spiral CAM pump, rotary piston pumps, rotary piston pump rotor, reprint please indicate the source.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Thanks for your message, we will reply you soon in our working time!