loading

Steel mills to solve equipment oil cross travelling

by:Waxing     2020-11-16
Steel mills to solve equipment oil cross travelling - 2021 01 - 27 a, general component is the spill oil leakage, oil, oil flow are three: ( 1) Oil leakage. Every half hour for fixed connection parts, drop a drop of oil to oil leakage. The active connection parts, every 5 min drip a drop of oil to oil leakage. ( 2) Drops of oil. Every 2 ~ 3 min for a drop of oil drops of oil. ( 3) The flow of oil. Each lmin for more than five drops for the flow of oil. Degree of equipment oil level is divided into serious oil spill, oil spills and slight spill third-class. Second, governance oil spill prevention and control method of ten kinds of methods, namely: frequently, to find, to change, change, wind, back, and blending, pad, welding equipment for leakage of the method. ( 1) Regular, regular check, ask frequently, often cure; ( 2) Looking for: looking for oil spill site carefully and causes; ( 3) Change: change the unreasonable structure and device; ( 4) Change: change in time failure of seals and other lubrication components; ( 5) Tangle: wrapped in tubing tapping sealing strip, sealing line, etc. ; ( 6) Back: increase or expand the oil return hole, smooth oil return, not spillover; ( 7) Distribution: correct selection of the sealing ring and groove surface; ( 8) Lead: outside the spillover, leak with tubing, oil tank, oil baffle plate, etc. ; ( 9) Mat: in combination with surface with special paper pad or the seal glue; ( 10) Welding, welding repair leaking oil hole, oil. In addition, do a good job to prevent and reduce the oil seal will also play a positive role. ( Source: the iron and steel metallurgy)
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Thanks for your message, we will reply you soon in our working time!