loading

Shaft alignment to reduce wear and tear

by:Waxing     2020-11-16
Shaft to reduce losses in 2021 - 01 - 23 DE hui group technical engineers, field technical guidance to the blue sky of fujian cement co. , LTD. According to the long-term dynamic practice accumulated data and the simulation data show that bearing used in working condition is caused by various factors shorten the bearing life, objective and subjective stage ( Stage includes is manufacturing, transportation, installation, lubrication, pairs, and basic condition monitoring and remove) Has important influence on the service life of the bearing, the bearing these phases in the life cycle for maximum service life of the bearing is crucial, so in most industries equipment requires shaft alignment, this helps to reduce the failure rate of machinery and equipment, improve the machine machine, lower costs, is now the trend of the development of new type of intelligent device data. In special cases during the period of epidemic, fujian blue sky cement co. , LTD requirements need to crusher end and motor end shaft of the after-sales service, through the after-sale technical service, to assist the blue sky of fujian cement company for equipment shaft alignment, reduce loss, and reduce maintenance costs. Through the after-sale technical service, to assist with shaft, to increase equipment uptime, reduce loss, and reduce maintenance costs. Axis of technical guidance in the field of preparations for top 1, check the shaft of the equipment is running well, including the measure data directory. 2, special batteries are documented. 3, nylon fixed sets. 4, gasket ( 0. 1/0. 2/0. 3/0. 4/0. 5毫米) 。 Shaft alignment procedure 1, with nylon sleeve respectively set two coupling ( 1/2) 。 2, fixed two measurement unit S fixed end, M motor end. Two measurement unit 3, adjust the infrared to the position. 4, set up data, two measurement unit, M distance unit to the end of motor, the motor center of anchor bolt. 5, start the meter display Settings in the data, 3 PM / 9/12 o 'clock position respectively in a record test data. ( Technology and seedling administration by fujian DE hui industrial equipment group feeds)
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Thanks for your message, we will reply you soon in our working time!