loading

Intermediate bearing frame according to the hull to strengthen preliminary positioning

by:Waxing     2020-11-20
Preliminary positioning 1 intermediate bearing frame according to the hull to strengthen. NMB miniature bearing bearing frame and welding gasket fabrication 1. 1 guy as creation, the intermediate bearing frame according to the hull to strengthen after initial positioning, in about 1 km away from mount fabrication location before and after a benchmarking in order to determine the mount in the future; Pull the light, in the mount position with axis to sample before and after, before and after the position based on pole position; 1. After 2 pull the light, the measured axis and the distance of the floor, identify intermediate bearing frame height direction after allowance for cutting, then according to the requirements of drawing size bearing frame fabrication; 1. 3, in accordance with requirements of the drawings, in the middle bearing frame fixed panel welding gasket spot welding, the process to determine the rear welding can be performed, must be noticed when fabrication welding gasket slope direction, then welding gasket blows grinding and achieve brushed with technological requirements. 2. Temporary fixed 2 intermediate bearing. At the beginning of a host of shafting on top, on the middle bearing frame panel in advance four jack-up top position welding wire, and then install the intermediate bearing in the intermediate shaft neck, and pay attention to the intermediate bearing shell after the center to the intermediate bearing flange end face distance requirements; 2. After 2 at the beginning of the host of the fabrication intermediate bearing temporary adjustment around the top wire with card, code tooling. 3 the host shaft load the initial installation 3 intermediate bearing before the adjustment. 1 shafting is inspection and connection bolt after the installation is complete, open the bearing cover, adjust the bearing base four top wire of high and low and temporary adjustment around the top wire, bearing lower bearing and shaft neck when clearance is zero, about equal interval; 3. After 2 bearing shaft assembly, check on both ends of hole and shaft neck about the gap between top and bottom is uniform, 3. 3 will be on the combination of surface and internal control clean, apply on clean lubricating oil; 3. 4 the intermediate bearing with the clean copper gaskets, right on the bearing surface; 3. 5 put the bearing cover overall on the bearing seat, and two taper pin bearing cover correct positioning; 3. Load bearing cap and tighten bolts on the bearing seat and tighten. Host shaft load adjustment of intermediate bearing protect the bearing cover mat about 2 mm high, must be coloring don't bring coated between bearing cover and bearing clearance position, face before and after the use of white cloth seal, prevent dust cabin, welding slag, impurities such as water vapor into the bearing seat in 5. Host pour glue after the installation of the intermediate bearing 5. Host 1 pour glue after 24 hours, in accordance with the requirements for the related parameters of intermediate bearing installation, conform to the requirements of the process, to retest of intermediate bearing meet, must meet the technological requirements; 5. 2 number of intermediate bearing frame hole and the hole; 5. 3 in the corners of each gasket measurement and welding gasket at the bottom of the bearing clearance, according to the experience and gasket blows with allowance, several processing is the thickness of the gasket, and the adjusting shim blows and blows with meet the inspection requirements can remove the adjusting shim drilling, drilling out the adjusting shim can be inserted at the bottom of the bearing seat and welding gasket, the final intermediate bearing the anchor bolt installation; 5. After four intermediate bearing anchor bolt tensioning, remove four jack-up jackscrew intermediate bearing base, reiteration, intermediate bearing load bearing conform to the requirements of the process, can be several processing positioning pin, and enter pin hole; 5. Temporary only 5 before and after removing intermediate bearing top wire; 5. 6 open the bearing cover, will jilt of oil pan installed in the tail end bearing oil cavity on the intermediate shaft, adjust to jilt oil pan Angle and the distance between the bearing Angle of ontology conform to the requirements of the drawing process; 5. 7 uniform check about intermediate bearing clearance, adopt the way of lead wire to check whether the total clearance conform to the requirements of the drawings; 5. 8 inner cavity of the intermediate bearing bush thoroughly clean; 5. 9 put the bearing cap on the bearing seat, and two taper pin bearing cover correct positioning, the bolt load and tighten, ensure that intermediate bearing installation integrity; 5. 10 front end and intermediate shaft bearing gap in the middle position to install the rubber, in order to prevent the dust into the intermediate bearing.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Thanks for your message, we will reply you soon in our working time!